Concrete Slab & Bag Calculator
Calculate cubic yards and exact number of 80lb and 60lb pre-mix bags needed for slabs, patios, footings, and sidewalks with sub-base gravel and rebar reinforcing.
Slab Dimensions & Thickness
144 sq ftOrder Ready-Mix Concrete Truck Delivery (1.96 Cu Yds)
Mixing 89 bags by hand will take over 8 hours of intensive labor. A ready-mix truck costs approximately $140–$180/yd and pours the entire slab in under 30 minutes.
| Material Spec | Quantity | Est. Cost |
|---|---|---|
| 80-lb High-Strength Concrete | 89 bags | $556.25 |
| Compacted Gravel Bed (4") | 2.5 tons | $104.53 |
| Welded Wire Reinforcing (5×10') | 4 sheets | $66.00 |
How the Math Works: Concrete Slab & Bag Formulas
Verified construction takeoff formulas & live variable substitution (IRC / IBC Code Baseline)
Total surface area to be formed with 2x lumber.
1 cubic yard = 27 cubic feet. Adds buffer for uneven excavation subgrade.
Standard commercial 80lb Sakrete / Quikrete bag yields 0.60 cubic feet mixed.
- One cubic yard equals 27 cubic feet. A standard 80-lb bag yields 0.60 cubic feet of mixed concrete, requiring 45 bags per cubic yard.
- 4,000 PSI air-entrained mix is recommended for exterior slabs exposed to freeze-thaw cycles.
Frequently Asked Questions: Concrete Bag Calculator
Verified trade answers for construction estimation, building codes, and waste allowances